Large Hydraulic Rock Splitter in Pune
Excavator-Driven Splitting for Big Excavations
On a big site, the rock itself is often what slows everything down. Blasting is risky near roads and buildings, and breakers make a lot of noise. A Large Hydraulic Rock Splitter in Pune avoids both problems. The S1200 series is built for deep holes, huge force and high daily output, all from a single excavator.
Here is what these splitters offer, how they fit into a project, and what to check before you commit.

What Is a Large Splitter?
Picture a very large wedge that pushes outward from inside the hole. A long hydraulic cylinder drives a centre wedge between two counter wedges, and the wedge set reaches holes close to two metres deep. That depth lets it open thick rock in one pass, which is what makes it so productive on large sites.
Models at a Glance
S1200 / S1200-E
| Hole | 108 to 118 mm wide, 1800 to 2000 mm deep |
|---|---|
| Splitting distance | 20 to 25 mm |
| Force | 24,516 kN (around 2500 tons) |
| Length | 3000 mm, wedge length 1200 mm |
| Working pressure | 350 to 500 bar |
| Weight | about 850 kg |
For even bigger work, the next step up is the S1800.
How the Splitting Works
Hydraulic pressure pushes the centre wedge between the counter wedges, a crack starts, and it runs along your line. Each hole takes about a minute, and in good conditions the machine can clear roughly 250 to 300 m³ a day. This kind of Hydraulic Rock Splitting Equipment in Pune works without noise and with almost no vibration, which is why it suits sites close to roads and buildings.
Where You Can Use It
As a Heavy Duty Hydraulic Rock Splitter in Pune, the S1200 suits:
Working in Sensitive Locations
Many big excavations happen close to something that cannot be shaken: a road, a pipeline, an occupied building, a slope. Splitting is well suited to these places because the force stays inside the rock. There is no flyrock, no blast wave and very little noise. That makes it easier to get approval for work in built-up areas, and it protects the structures around you.
Preparing the Site
Preparation decides how smoothly the day goes. Walk the area, mark the splitting lines, and plan the holes towards a free face. Set the hole spacing to suit the rock thickness, typically 600 to 800 mm. Make sure the drilling is finished and checked before the splitter arrives, and keep the working area clear of people and loose equipment. A tidy site and a clear plan let the splitter do its job without interruptions.
Common Mistakes to Avoid
Safety Tips
Care and Maintenance
At the end of each shift, clean the wedge set, check the hoses and couplings, and look for leaks. Keep spare hoses and couplings on site. Store the splitter dry and supported, so the wedge set does not get damaged when the excavator is parked. Regular checks keep the machine ready for the next shift.
Carried by Your Excavator
An Excavator Mounted Hydraulic Rock Splitter in Pune uses the excavator's own hydraulic supply, so there is no separate power unit to arrange. The operator stays in the cab and moves from hole to hole in minutes. Before ordering, check that the excavator can supply the right pressure and flow for the splitter.
Daily Output and Scheduling
At roughly a minute per hole, output depends mostly on how fast you can drill. The splitter itself rarely holds up the job. A good rhythm is to keep the drilling ahead of the splitting, so the excavator always has a prepared hole waiting. Over a long shift, that steady pace is what adds up to hundreds of cubic metres.
Buying from a Pune Manufacturer
A Large Rock Splitter Manufacturer in Pune can help you match the splitter to your excavator and your rock. Questions about hydraulic flow, hole spacing and carrier size are much easier to settle when the maker is close by, and spares and service are easier to arrange too.